Environmental lawyers in Buenos Aires: permits, impact assessment, waste management, environmental insurance, inspections and liability for environmental damage.

What we solve

Nine fronts, one team.

From the permit that lets the plant run to the claim that stops it. We work with industrial companies, energy operators and developers.


_01Permits and authorizationsEnvironmental fitness certificates and sector permits before federal, provincial and municipal authorities.
_02Environmental impact assessmentSupport through the EIA procedure and through public participation stages where they apply.
_03Waste managementClassification of the generator, transport and final disposal under the hazardous and industrial waste regime.
_04Environmental insuranceAnalysis of the obligation under Section 22 of Law 25,675 and review of the cover actually taken out.
_05Inspections and administrative proceedingsAssistance during the inspection, written defence and representation in penalty proceedings.
_06Environmental damageDefence against remediation claims, environmental injunctions (amparos) and class actions.
_07Liabilities in transactionsEnvironmental due diligence in the purchase of plants and industrial facilities.
_08Energy and the Neuquén basinEnvironmental framework applicable to oil and gas operations, coordinated with our Vaca Muerta Desk.
_09Environmental complianceObligation matrix by site, deadline calendar and periodic compliance audits.

“In environmental matters the fine is rarely the expensive part. What costs is the precautionary shutdown, the works brought to a halt and the permit that does not come through in time.”

_Environmental Law Team · R&A

In depth

Environmental compliance, in depth.


Environmental lawyers in Argentina: permitting, compliance and defence

Raskovsky y Asociados advises industrial companies, energy operators and developers on environmental compliance and on defending administrative and court claims. This is an area where the risk does not show up as a fine: it shows up as a plant that cannot operate, works halted by an injunction or an acquisition that collapses during due diligence.

Our work is aimed at the company knowing exactly what each authority requires for each site, and being able to prove it when asked.

The framework: minimum standards and overlapping powers

Section 41 of the Argentine Constitution recognises the right to a healthy environment and allocates powers: the federal government enacts minimum environmental protection standards and the provinces supplement them, retaining original ownership of their natural resources. Law 25,675, the General Environmental Act, operates on that basis, with a provincial layer and a municipal layer on top of it.

The practical consequence is that a single plant may be subject to three frameworks that do not always say the same thing or fall due on the same dates. The first task is usually cartographic: building the full matrix of obligations that actually apply to each facility, because until that matrix exists the company does not know whether it is compliant.

Permits and environmental impact assessment

Installing or expanding a facility usually requires an environmental fitness certificate, with an impact assessment procedure that depends on the activity, the scale and the jurisdiction. In projects of a certain size the procedure includes public participation stages, which are worth preparing seriously: they are the point where a project that was on track most often gets stuck.

We handle the process from defining the framing —which risk category applies, which study is required— through to obtaining the permit, coordinating with the technical consultants who prepare the studies. Experience says that projects are not delayed by technical content but by how the file is formally assembled.

Waste: where the risk concentrates

This is the front that generates the most penalties and the one most often underestimated. The points we review:

  • Classification of the facility as a generator and its registration in the applicable register
  • The waste stream: what is actually generated and how it is declared
  • Authorization of the contracted carriers and operators, and whether it is genuinely in force
  • Traceability of manifests and how they are filed
  • Temporary storage on site and the conditions applied to it
  • Effluents and discharges, with their discharge permits

One point worth keeping in mind: hiring a third party for transport or disposal does not transfer liability in full. If the operator is not authorized or diverts the waste, the generating company remains exposed. That is why documentary control over suppliers is part of compliance, not an extra.

Environmental insurance and liability for damage

Section 22 of Law 25,675 requires anyone carrying out activities that are risky for the environment to take out insurance sufficient to fund the remediation of any damage. Beyond checking whether the obligation reaches the activity, we review the policy actually in place: it is common to find cover that does not match how the site really operates.

On liability, the core of the regime is remediation: whoever causes environmental damage must restore things to their previous state, and only where that is not technically feasible does substitute compensation apply. That is a different logic from classic property damage and it changes the defence strategy entirely. We act in remediation claims, environmental amparo proceedings and class actions, and in coordinating the position with insurance cover.

Environmental liabilities in transactions

Buying a plant means buying its environmental history. In M&A deals and transfers of facilities we review:

  • Permits in force and whether they can be transferred to the buyer
  • Pending proceedings, inspection reports and formal notices
  • History of activity on the site and possible soil contamination
  • Contracts with waste operators and whether they are in order
  • Ongoing claims from neighbours or organisations

Findings translate into the same instruments as in any other area: price adjustment, specific seller warranties, a holdback on part of the payment or conditions precedent to closing. The difference is that an environmental liability can surface many years later and does not always end with a change of owner.

Why choose us for environmental matters

The file is handled by a partner, working with the technical consultants on each project. For operations in the Neuquén basin we work alongside our Vaca Muerta Desk, which adds local presence and integrated accounting services. And when the environmental front comes together —as it usually does— with an employment, corporate or criminal dispute, the firm covers it without referring the case out.

Frequently asked questions

What companies ask us first.

Common questions on permits, waste and inspections.


What environmental permits does an industrial plant need?
It depends on the activity, the scale and the jurisdiction, and there are almost always several at once: an environmental fitness certificate, registration as a waste generator, discharge or emission permits and municipal authorization. Because a federal framework of minimum standards coexists with provincial and municipal rules, the first useful step is to build the full matrix of obligations that apply to that specific site. Until that matrix exists, the company does not know whether it complies.
Is environmental insurance mandatory?
Section 22 of Law 25,675 requires anyone carrying out activities that are risky for the environment to take out insurance sufficient to fund the remediation of damage. Whether the obligation reaches a given activity is a specific analysis, which we carry out together with something equally important: checking whether the policy in place matches how the facility actually operates. Holding a policy that does not cover what you do is close to holding none at all.
When buying a plant, who is liable for prior contamination?
This is one of the reasons environmental due diligence is not optional. An environmental liability can surface years later and its allocation does not always follow the change of owner in a simple way. That is why the prior review —site history, pending proceedings, permits, contracts with waste operators— translates into concrete clauses: price adjustment, seller warranties, holdbacks or conditions precedent to closing.
An environmental inspection has arrived. What do we do?
Accompany it rather than resist it, and pay close attention to the inspection report: what is recorded there is the basis of the later proceeding and of any defence. It helps to have decided in advance who receives the inspector, what documentation is shown and where it is filed. The written defence comes next, with a short deadline, and it is the stage where most can be achieved. In environmental matters the greater risk is usually not the fine but the precautionary shutdown, so responding early matters.
What is an Environmental Impact Assessment, and which projects require one?
It is a mandatory procedure for projects that may have a significant impact on the environment: industry, large-scale works and extractive or energy activities, under Law 25,675 and the applicable provincial rules. Without approval the project cannot start, and proceeding anyway exposes the company to penalties and to shutdown.
How far does a company’s liability for environmental damage go?
Law 25,675 establishes strict liability: proving the damage and the causal link is enough. The company must remediate the environment and, where that is not possible, pay substitute compensation. In addition, executives may be criminally liable under Law 24,051 where the environmental offence is made out.